3 Ton Main Boilder Package Type
3 Ton Backup Boilder Room Tube Type
1.5 Ton Supportive Boilder Package Type
State of the art "Mechanical Workshop" meeting all compliances
State of the art "Electrical Workshop" meeting all compliances
2 Warping Facilities with a 2.4 Ton capacity per 8 hour shift
1 Sectional Warping facility with 1.5 Ton capacity per 8 hour shift
1 Sizing Facility with Capacity to process 3 Tons per 8 hour shift
Hard Winding with capacity to process 1.5 Ton per 8 hour shift
Soft Winding with capacity to process 1.5 Ton per 8 hour shift
Capacity to process 7000 meters per day
2.5 Tons total weaving capacity per day
Capacity to produce 1 ton Per day
42 Machines (Juki Auto Triming, Juki Chain Lock continuous, Pegasus over lock and Brother Multi Head sticking machines)